26 15152 Bapco - Bahrain Clay filter (16V1616)Fuller’s earth clay replacement works at Bapco-KMU 3,500 April-16
27 15141 Bapco - Bahrain Carbon Filter(62C6261 AX) activated carbon change out works at Bapco-2 HDU DEA 2,500 April-16
28 15149 Bapco - Bahrain Catalyst Vacuuming works for FCCU at Bapco during shutdown 3,500 March-16
29 15001 SASREF - T-8253-Wet slops oil tank (Dia 12.19m, Height 9.14m), blinding, oil vacuuming, open manway, Desludging, hydro jetting, weld build up, patch works, box up, Despading 3,500 March-16
30 11163 SASREF - T-8140 (Auto Diesel) (Dia 34.14m, Height 16.46m), Blinding, open manway,Desludging, Hydro jetting works, mechanical maintenance, bottom plate (100%) replacement,Annular plate (100%)replacement, Tank hydro testing, box up, Despading 15,000 Jan-16
31 15104 Al Muzain - Sipchem Shutdown services-Supplied skilled resources and construction equipments for Shutdown at Sipchem 8,000 Nov-15
32 15099 Arabian Chemical Terminals - Jubail Tank (T-07) Light gas oil) cleaning works-open roof nozzles, butter washing with degreaser (5% soda ash), water flushing, Pipe line flushing 2,500 Oct-15
33 15095 Arabian Chemical Terminals - Jubail ISO tanks (8 no’s 24 m3)with product (75%PC 32 & 25% Razeen) preheating and dumping at Beeah 2,500 Oct-15
34 15104 Al Muzain - Saudi Chevron Shutdown services –Supplied skilled resources and construction equipments for Shutdown at Saudi Chevron 8,000 Oct-15
35 15095 Arabian Chemical Terminals - Jubail Tank (T-112) (Dia5.8m, H-10.7m)—Loading of 120 MT of product (75% PC 32 & 25% Razeen) to ISO containers& disposal @ Beeah, High pressure water jetting of tank floor and butter washing of shell, inspection & box up 8,500 Oct-15
36 15001 SASREF - Tank T 8208 Diesel tank, Blinding,open manway, Desludging, hydro jetting, inspection,roof repairs, staircase repairs, box up, Despading 4,500 Sept-15
37 11163 SASREF - T-8214-Dual purpose kerosene (dia 60.96m, height 21.95 mt, Floating roof tank),blinding, open manway, Desludging, hydro jetting, mechanical maintenance, secondary seal replacement, roof plate / bottom plate repairs, box up manway, Despading 8,500 Sept-15
38 15097 Arabian Chemical Terminals - Jubail Tank (T-116) (Dia 5.8m, Height 10.7mt) (Product—RV 100, 2Ethylexyl nitrate), open top nozzles, Butter washing with degreaser (5% soda ash), vacuum out waste effluents, open side manway, inspection, box up 3,500 Sept-15
39 15096 Arabian Chemical Terminals - Jubail Tank (T-10) (Dia-12.56m, height 17.0m) (De-aromatized Hydro carbons) tank cleaning-butter washing with 5% soda ash, line flushing with degreaser (5% soda ash), vacuuming, inspection, final box up 4,500 Sept-15
40 11-163 Sasref - Jubail Crude oil Tank (8102) (60.96mt.H-20.15m)isolation, Desludging, HP jetting, remove and install secondary & primary roof seals, floor patch works (9 no’s), annular plate weld build up, Bleeder vent replacement, Pontoon strip lining repairs, box up 15,000 June-15
41 15-042 Nabors - Hawtah Rig#210 Hydrojetting works for Rig mast, Derrick & sub structure at Nabors Rig 210-Hawtah 2,705 May-2015
42 15-005 SADARA-SASREF - CEN Line decommissioning works: 24” & 20” Carbon steel pipe line product drain out, water circulation and handover for tie in operation. Reinstate the line after hot works. Tank product transfer and bolt torquing works. 8,500 May-15
43 11-163 Sasref - Jubail Liquid Sulfur Tank (5103) ( 10.67 mt. H-12.19 m) isolation, breaking solid sulphur by jack hammer and vacuuming, HP jetting, sketch plate (6 no’s) replacement, Nozzle modifications, sump pit replacement, heating coil removal, new heating coil fabrication (600 inch dia), installation, NDT, Hydro test, painting, box up 12,000 May-15
44 14-185 Bapco - Bahrain Catalyst vacuuming works for FCC Unit during FCCU STR INT SD-2015 8,500 May-15
45 14-024 GIPC - Bahrain Catalyst Replacement works for HT shift converter (R-0401-61.82 m3) and LT shift converter (R-0402-87.7 m3) during GPIC Mar-15 T & 1 12,000 Apr-15
46 14-027 GPIC - Bahrain Unloading and reloading of Rasching Rings for CO2 Absorber C0502 (bottom bed 112 m3) during GPIC March-15 T&I 7,500 Apr-15
47 14-051 MCSC-GPIC - Bahrain Mechanical cleaning by using pneumatic cleaning machine with brushes (SS, Brass, Nylon) of heat exchanger tubes (E0301-565 tubes,dia-29.5 mm; E0301 B-622 Tubes, dia 24.3 mm; E-1201-567 tubes, dia 28.7 mm; E-8301 A 983 tubes, dia 33.88 mm; E-8401 727 tubes, dia 33.9 mm and air blowing for conducting IRIS test 5,500 March-15
48 15-014 Bapco - Bahrain Catalyst handling works for #Absorbers 58C8802/03/04- KGSP 2015 T&I @ Bapco 11,500 Feb-15
49 11-163 SASREF - Jubail We slops Tank(8255) ( 12.19 mt. H-9.14 m) isolation, Desludging, HP jetting, roof ladder repairs, heating coil repairs, coil hydro test, box up 7,500 Jan-15
50 14-141 DRIC-A1 Tuwairqi - Dammam Module-1 (Midrex design) Reformer catalyst change out; Mechanical works, Catalyst unloading (324 tubes), segregation/ pre socking, Catalyst sock loading, DP measurements, Box up 25,000 Jan-15