Projects


# PROJECT No. CUSTOMER / LOCATION DESCRIPTION MAN HOURS YEAR - MONTH GALLERY
76 13-094 Bapco - Bahrain Catalyst skimming works for catalytic reactors (7811/21) @ Bapco SRU#2 7,500 Jan-14
77 13-133 Bapco - Bahrain Activated carbon change our carbon filter @ 1 ARU carbon filter B 2,500 Nov-13
78 13-133 Bapco - Bahrain Activated carbon change our carbon filter @ 1 ARU carbon filter A 2,500 Nov-13
79 13-110 Saudi Aramco-Uthmaniyah gas plant - Afzco Hydro jetting works for condenser @ Uthmaniyah Gas plant 3,500 Oct-13
80 13-126 Sasref-MSS - Jubail HFO tank T-8204 (Roof underside, Rafter & girder) HP Jetting works 3,500 Oct-13
81 13-115 Bapco - Bahrain Catalyst replacement works for Zinc Oxide drum 6,500 Oct-13
82 13-098 Arabian Chemical Terminals - Jubail Tank (1-Hexane) cleaning for product swap (3 tanks) 4,200 Oct-13
83 11-163 Sasref - Jubail Mixed aromatics Tank (8125) (14.63 m, H-16.46mt) isolation, Desludging, HP jetting, mixer maintenance, box up 3,500 Jan-13
84 13-098 Arabian Chemical Terminals - Jubail Line (1-Hexane) cleaning for product swap 4,200 Oct-13
85 13-010 Arabian Chemical Terminals - Jubail Di-ethanol amine tank cleaning for product swap (3 tanks) 4,200 Oct-13
86 13-010 Arabian Chemical Terminals - Jubail Di-ethanol amine line cleaning for product swap 4,200 Oct-13
87 13-013 SASREF-SRU-3-JGC Intl - Jubail SRU#3 Main burner / reaction chamber modifications incl. another welding, NDT & unit spading (de) works 3,500 Oct-13
88 13-073 Saudi Aramco- Hawiyah NGL - Afzco Catalyst handling works for feed gas de-hydrator (unit-1/2/3) 3,500 Sep-13
89 11-163 Sasref - Jubail Wet Slops Tank (9632) (10.67 mt. H-9.14 m) isolation, Desludging, HP jetting,equalizer line modification, box up 5,000 Sep-13
90 11-163 Sasref - Jubail Low sulphur gas oil Tank (8139) (19.51 mt. H-16.46 m) isolation, Desludging, HP jetting, drain line modification, weld build up works, box up 2,500 Aug-13
91 13-073 Saudi Aramco-Hawiyah HNGL - Afzco Catalyst replacement works for feed gas dehydrator 2,500 June-13
92 13-034 Saudi Aramco-Berry-Afzco- - Jubail Catalyst change out works for sulphur converters-@ different trains 4,500 June-13
93 13-013 SASREF-SRU-3-JGC Intl - Jubail SRU#3 Main burner/ mixing chamber modifications incl. patch plate, nozzle installation,anchor installation & touch up painting works, Unit spading (de) 6,200 May-13
94 11-163 Sasref - Jubail Wet Slops Tank(9633) (10.67 mt. H-9.14 m) isolation, Desludging, HP jetting, drain line modification, weld build up works, box up 5,000 Apr-13
95 13-028 SASREF-SRU-2 - Jubail Catalyst Unloading & Reloading works for SRU #2 reactor (R-5201) 2,500 March-13
96 12-123 SABIC-IBN ZAHR-TGC - Jubail Concrete (550 mm thick slab, 5.3 m*1.5 m) cutting by using High pressure water jet 7,500 March-13
97 12-093 Bapco - Bahrain Catalyst vacuuming works for FCCU during 2013 T & I 25,000 Feb-13
98 11-163 Sasref - Jubail Sour water storage tank (5401) (17.27 m, H-10.97 m) isolation, Desludging, HP jetting, box up 2,900 Feb-13
99 12-067 Sasref - Jubail Heavy fuel oil Tank (8203) (60.96 m, H-21.95 m) annular plates & Roof replacement works, tank hydro testing 75,000 Feb-13
100 12-131 Bapco - Bahrain Calgon activated charcoal replacement works for OGTU carbon filter 2,500 Jan-13