PROJECT No. |
CUSTOMER / LOCATION |
DESCRIPTION |
MAN HOURS |
YEAR - MONTH |
GALLERY |
51 |
14-123 |
DRIC-Al Tuwairqi - Dammam |
Module-2 (Midrex design) Reformer catalyst change out; Mechanical works, Catalyst unloading (324 tubes), segregation/ pre socking, Catalyst sock loading, DP measurements, Box up |
25,000 |
Jan-15 |
|
52 |
14-191 |
Bapco - Bahrain |
Catalyst handling works for #2 TGTU V 6804 Carbon filter @ Bapco |
4,500 |
Dec-14 |
|
53 |
14-035 |
Maaden Phosphate Company - Maaden |
Catalyst Handling works for SAP Train C Bed#1 during December-14 Turn around; Catalyst unloading (180 m3), segregation/ screening, sock loading |
15,000 |
Dec-14 |
|
54 |
14-163 |
Bapco - Bahrain |
Catalyst handling works for LSDP C 7602 Zinc oxcide vessel @ Bapco |
4,500 |
Nov-14 |
|
55 |
14-163 |
Bapco - Bahrain |
Catalyst handling works for LSDP V 7866 Carbon filter @ Bapco |
3,500 |
Nov-14 |
|
56 |
14-108 |
Marafiq-Jacobs/PCMC - |
Chemical cleaning (Pickling & Passivation) works for Super duplex stainless steel piping (9 racks) for SWRO-4 Project |
5,500 |
Nov-14 |
|
57 |
11-163 |
Sasref - Jubail |
Low sulphur gas oil Tank (8138) (19.51mt. H-16.46 m) isolation, Desludging, HP jetting, box up |
3,500 |
Sep-14 |
|
58 |
11-163 |
Sasref - Jubail |
Heavy aromatics Tank (7701) (7.62 m) isolation, Desludging, HP jetting, Roof cleaning, box up |
3,500 |
Aug-14 |
|
59 |
11-163 |
Sasref - Jubail |
Diesel Tank (8207) (60.96 m) isolation, Desludging, HP jetting, Roof handrail toe guard repairs, box up |
5,500 |
Aug-14 |
|
60 |
11-163 |
Sasref - Jubail |
Portable water Tank (9221) (19.51 mt. H-18.30 m) isolation, Desludging, HP jetting, weld build up, annular plate replacement works, box up |
7,000 |
June-14 |
|
61 |
11-163 |
Sasref - Jubail |
Sulpholine + Arom. Tank (8123) (10.67 m H-8.70 m) isolation, Desludging, HP jetting, box up |
7,000 |
June-14 |
|
62 |
14-063 |
Bapco - Bahrain |
Catalyst handling works for SRU#3 Converters @ Bapco |
8,500 |
June-14 |
|
63 |
13-145 |
SASREF-SRU-2-JGC Intl - Jubail |
SRU#2 Main burner/ mixing chamber modifications incl.patch, nozzle installation, anchor installation & touch up painting works, Unit spading (de) |
6,200 |
May-14 |
|
64 |
11-163 |
SASREF - Jubail |
Crude oil Tank (8103) (60.96 mt. H-20.15 m) isolation, Desludging, HP jetting, remove and install secondary & primary roof seals, box up |
15,000 |
May-14 |
|
65 |
11-163 |
SASREF - Jubail |
Liquid Sulfur Tank (5104) (10.67 mt. H-12.19m)isolation, breaking solid sulphur by jack hammer and vacuuming, HP jetting, heating coil removal, new heating coil fabrication (600 inch dia), installation, NDT, Hydro test, painting, box up |
12,000 |
May-14 |
|
66 |
11-163 |
Sasref - Jubail |
Industrial water Tank (9202) (12.19 mt. H-10.67 m) isolation, Desludging, HP jetting, weld build up, patch plate works, box up |
7,000 |
Apr-14 |
|
67 |
11-163 |
Sasref - Jubail |
Visbreaker Residue Tank (8144) (29.26 mt. H-15.95 m) isolation,Desludging, HP jetting, box up |
4,000 |
Apr-14 |
|
68 |
13-063 |
Bapco - Bahrain |
LSFO T&I-2014- Catalyst change out (total 2,284 ft3) works for Zinc oxide vessel (6409), high temperature shift converter (6412), low temperature shift (6413) converter and Methanator (6420) incl. blinding (de) and manway open / close and repairs |
15,000 |
Mar-14 |
|
69 |
14-018 |
Chemanol-Methanol Chemicals company - |
E-5118- vertical fixed tube (NEN) product column Reboiler exchanger works includes blinding, opening covers, cutting (hot works) and removing top dish end (1,150 mm dia* 14 mm thk), Hydro jetting and mechanical cleaning works for tubes, RFT, tube plugging, hydro testing, dish end fit up/ welding, RT, PWHT, Deblinding, torquing |
4,500 |
Mar-14 |
|
70 |
14-017 |
Chemanol-Methanol Chemicals company - |
Catalyst handling (unloading/ loading) works for Methyl amines converter (D-5101) (4 beds) (47 m3) incl blinding (de), torquing, Screening works |
4,500 |
Mar-14 |
|
71 |
11-163 |
Sasref - Jubail |
Heavy fuel oil Tank (8204) (60.96 m, H-21.95 m) annular plates & Roof replacement works, tank hydro testing |
75,000 |
Feb-14 |
|
72 |
14-011 |
Saudi Aramco-Hawiyah gas plant - Afzco |
Catalyst handling & jetting works @ Saudi Aramco Hawiyah Gas plant |
3,500 |
Feb-14 |
|
73 |
14-020 |
Saudi Aramco Jeddah-OZEST - |
Naphtha Unifiner Reactor (Y10-C1) catalyst change out at Saudi Aramco Jeddah Refinery |
3,500 |
Feb-14 |
|
74 |
14-010 |
Bapco - Bahrain |
1-TGTU Carbon Change Out Works BAPCO No. 2 Sulphur Plant-- Bahrain |
3,500 |
Jan-14 |
|
75 |
13-151 |
GPIC - Bahrain |
GPIC Resin Sludge Removal and Water Jetting of Formaldehyde tank |
3,500 |
Jan-14 |
|